Soil Type |
|
Pipe Material |
|
Calculation Method |
Parameter | Value | Unit | |||
---|---|---|---|---|---|
Density Grains | [kg/m3] | ||||
In-situ Density | [kg/m3] | ||||
Mixture Density | [kg/m3] | ||||
Soil d50 | [mm] | ||||
Soil d85 | [mm] | ||||
SPT | [-] | ||||
Cvd By Volume | [%] |
Parameter | Value | Unit | ||
---|---|---|---|---|
Pipe Diameter | [m] | |||
Required Pump Power | [kW] | |||
Required Cutter Power | [kW] | |||
Required Total Power | [kW] | |||
Fuel Consumption | [L / Hour] | |||
Mixture | [m3/hour] | |||
In-situ | [m3/hour] | |||
Dry Solids | [tonnes/hr] |
You have selected more than three dredgers to compare. Only the first three will be compared.
You did not select any dredger to compare. Please select a maximum of three dredgers by checking the checkboxes in the left column.