| Calculation option | Dredge Path | Total Volume | |||
| length | [m] | ||||
| Width | [m] | ||||
| bank heigth | [m] | ||||
| Volume | [m3] | ||||
| no of years | [years] | ||||
| Working days per year | [days] | ||||
| Working hours per day | [hours] | ||||
| total working hours | [hours] |
|
Dredge Type
|
| Parameter | Value | Unit | |
|---|---|---|---|
| Average Efficency | [%] | ||
| Average production | [m3/h] | ||
| Effective working hours | [hours] | ||
| needed insitu Production | [m3/h] | ||
| needed mixture Production | [m3/h] | ||
| Number of dredgers | [m3/h] | ||
| needed mixture Production per dredge | [m3/h] |
| Parameter | Value | Unit | ||
|---|---|---|---|---|
| Pipe Diameter | [m] | |||
| Required Pump Power | [kW] | |||
| Required Cutter Power | [kW] | |||
| Required Total Power | [kW] | |||
| Fuel Consumption | [L / Hour] | |||
| Mixture pipe length | [m] | |||
| D50 | [-] | |||
| Cvd | [-] |